Projects
Catheterization Lab Expansion, VA San Diego, CA.
Architectural Design of existing Catheterization Laboratory to accommodate the requirements of new catheterization machine including control room, generator room, and supply storage. Area of renovation is approximately 2,300 Sq.Ft. Architectural, fire protection, plumbing, HVAC and electrical system were modified to accommodate the renovation and provide hybrid operating environment. The control room has new flooring, counter tops and was designed per new requirements of the imaging machine. Phasing plan was developed for continued operation of an adjoining lab.
Project Size: 2300 S.Ft.
Scope: Architectural Design
Project Costs: $2.5M
Design Endoscopy Renovation, VA San Diego, CA.
The architectural design of existing space into new Endoscope Processing/High Level Disinfection area including Dirty Room, Clean Room, Reading Room and Scope Storage Room. The area of renovation is approximately 600 sq. ft. New Endoscope Processing/High Level Disinfection area will adhere to VA guidelines/specifications and will meet space programming and function. Renovation will include requirements to accommodate new equipment requirements. Architectural and structural elements, as well as fire protection, plumbing, HVAC and electrical systems were redesigned to meet the new parameters.
Project Size: 600 S.Ft.
Scope: Architectural Design
Project Costs: $1M
Alondra Park Pool & Skate Park
3.5 acre park facility with swimming pool, Skate Park, splash pad, picnic areas.
Scope: Jurisdictional Approval, Bid and Award, Construction Management
Alondra Park Comfort Stations
Scope: Construction Management
Centinela Area Probation Office
The Centinela Probation building provides 25,000 square feet of useable office space for staff of 152, containing offices for administration, support staff, and Probation Officers. The Public Works Building and Safety District Office is an additional 5,000 square feet of office space for a staff of 21. The parking lot accommodates 135 staff parking spaces and an additional 45 spaces for visitors. The total project costs are $21M.

SRD Management provided design management which includes managing of consultants for the soils investigations, phase I and II environmental investigation, environmental impact reports, topographical surveys, utility surveys and brown-field site remediation, preparation of scope of work, preparation of budget and schedule, management of jurisdictional reviews and approvals from Local, State and Federal Authorities, independent check estimates, and adherence to sustainable design goals. Construction Phase services included RFIs & Submittals.
Scope: Project Management / Construction Management
South Los Angeles Sheriff's Station
40,000 square foot facility includes Sheriff Station, Service Building, helistop and communication tower.
Scope: Project Management and Construction Management of Telecommunication Procurement and FFE
Carson Sheriff Station
A two story addition of 8,600 Sq. Ft. with 3,700 Sq. Ft. of existing will be renovated.
Scope: Project Management for Feasibility Study and Architectural Program.
Lennox Constituent Service Center
5,400 Sq. Ft. expansion to the Lennox Library, 4,400 Sq. Ft. Community Center, 5,300 Sq.ft. Retail/Offices, 1,300 Sq. Ft. Board Office.
Scope: Project Management for Architectural Program
Palmdale Sheriff Station
50,000 square foot facility includes Sheriff Station, Service Building, Helistop and communication tower.
Scope: Construction Management Supervisory role.
San Dimas Sheriff Station
30,000 square foot facility includes Sheriff Station, Service Building and communication tower.
Scope: Construction Management Supervisory role.
Antelope Valley Building and Safety Office Remodel
8,000 square foot facility includes one stop shop concept with Regional Planning and Health Department offices with Fire Department in adjacent spaces.
Scope: Project Management for Programming and Design.
La Puente Building and Safety Office
6,000 square foot facility includes one-stop shop concept with Regional Planning with Fire Department office.
Scope: Project Management for Architectural Program and Schematic Design.
Santa Clarita Building and Safety Office
Scope: Project Management for Architectural Program and Schematic Design.
Metro Blue Line Pedestrian Path
Scope: Project Management for Schematic Design.
Special Enforcement Bureau - Sheriff's Department.
Scope: Project Management for Architectural Program and Schematic Designs
Via Verde Parking Structure
Scope: Project Management for Feasibility Study.